Rail Traffic/Operator Command Center

Shenzhen China resources building B1M floor command hall construction

As a modern international city, shenzhen has been attracting much attention. In February 2019, the central committee of the communist party of China and the state council issued the outline of the development plan for the guangdong-hong kong-macao greater bay area. In the idea of building the guangdong-hong kong-macao greater bay area into a world-class one, shenzhen is the technological and financial innovation highland in the 9+2 cities and will be the core of the greater bay area in the future.

China headquarters in shenzhen bay, bamboo shoots building houhai financial headquarters is located in shenzhen, is the core of the shenzhen bay area, as shenzhen corresponding to the forefront of "guangdong, hk &macau big bay area", unique "explosion" form of ground out, with China resources "the Chinese earth, rain and dew to moisten" original intention to convey a positive force in shenzhen.

China resources headquarters building, photo courtesy of baidu

 

And traditional office, China resources building, in order to "headquarters economy and culture of science and technology innovation" concept, with characters of urban operators to run the city development, with a forward-looking strategy adhere to the "change" with the city of outstanding practice, for the headquarters of China resources building of science and technology, human nature system, build the CRC shenzhen bay data resource sharing system.


The KVM Husion distributed collaboration system into the headquarters of China resources building, for the bamboo shoots building B1M layer command hall set up a set of communications, command, scheduling and intelligent scheduling command platform, and can be real-time access to talent park, shenzhen bay sports center, vientiane business district, north and south residential area, finance building, such as data from multiple locations, have the effect of resource deployment, gathering, one-stop shop to meet enterprise diversified needs.

B1M layer command hall device includes the front nine landing screen single reclined at the table shows, the back four double cross screen operation and 1 4 across the screen operation, four of them across the screen shows that the mixed operation of graphics computer screen function, can be separately for each picture shows normal operation, reclined at the table personnel using a keyboard hotkeys, local to need a key to put into the data information of the display terminal, push for commanders to conduct a comprehensive judging and rapid analysis, at the same time, was at staff also can use the way of local keyboard hotkeys, a key fetching data information to the local reclined at the table display.

 

The large screen layout in the command hall is 3 x 11 columns. According to the project requirements, Husion team has designed a variety of scene corresponding modes. The system demonstration, security monitoring and other platforms can be connected to the system for operation, playing an interconnection and responsive role. System can match the BIM software system, also make operators comprehensive understanding of bamboo shoots building, through the control of hand-held mobile software and Windows software call scenario, full video preview, domestic echo and operation experience, is a very good operating visual, each node status can query, peripheral devices "vital signs" can present, convenient management, and can effectively reduce the maintenance cost.


According to the system function, the project system adopts double backup mode, including the hot standby server, heat exchange system of hot standby, terminal link, the maximum extent to ensure the stability of the system operation, decentralization of the distributed design, each part independently, once appear problem is usually a single point of failure, not affect the whole system, the key nodes redundancy backup, 7 x 24 hours work.


Operator can also be through hand-held mobile terminal software, for the curtains of the hall, lighting, power supply equipment such as centralized control and signal scheduling, equipment terminal state echo, four cameras can cover the entire command hall, handheld mobile operators through the central control software and Windows software, turn the camera and calls the save preset greatly improve the convenience of the operation personnel work.

 

The Husion team also fully considered the requirements of the command hall on the B1M floor of China resources building. The system can use the remote terminal for remote video meeting, which is simple and powerful.


As the main equipment provider of the construction system of the B1M floor command hall of the headquarters of China resources building, Husion believes that There's always another level.

Guangzhou Husion Electronic Technology Co., Ltd ? Copyright粵ICP375938475號Contact UsSitemapLegal statementBy:yinxiang
Unified National Service Hotline:400-9922-259

Service Hotline

400-9922-259

Focus on Husion Electronics

Focus on Husion Electronics